Layout
Large kitchens often need better proportion, lighting, and island planning more than they need additional square footage.
page === 'home' && ( )
Skip to main content
Design-build kitchen remodel planned for Estate homes in 1980s-2000s
Delta - Bathroom and Kitchen Remodeling is a Lake Forest-based design-build firm serving the North Shore and nearby Chicagoland. In Kildeer we remodel kitchens in Estate homes from the 1980s-2000s era, scoping each project to the home and finish level after an in-home visit.
Kildeer kitchens that work over time are the ones designed around the actual house. Local projects often start with this condition: Large custom-home kitchens often need updated cabinet profiles, better lighting, island resizing, and a more current connection to dining or outdoor living. We shape cabinetry, appliances, lighting, and stone around how the household cooks, hosts, and moves through the room.
Pricing is shaped by cabinetry specification, finish level, structural work, and how much the layout moves. Every project is priced after an in-home visit.
| Tier | Range | What's typical |
|---|---|---|
| Refresh | $40K–$65K | Same footprint, refaced or stock cabinetry, new counters and tile, no plumbing relocation. Cosmetic refresh that respects the existing layout. |
| Standard remodel | $65K–$130K | Custom cabinetry, stone counters, full appliance suite, layout improvements, lighting design. Most projects in this range. |
| Full gut renovation | $130K–$250K+ | Walls removed, premium appliances (Sub-Zero, Wolf, La Cornue), butler's pantry, custom millwork, structural changes. Estate-scale work. |
Kitchen Remodeling in Kildeer is priced after an in-home visit. Cost and timeline depend on scope and finish level.
Large kitchens often need better proportion, lighting, and island planning more than they need additional square footage.
Estate and Colonial homes need cabinetry proportions, storage, and trim language specified to the house, not pulled from a catalog.
Sub-Zero, Wolf, Miele, and Thermador integration planned with ventilation, paneling, electrical, and gas routing before cabinets are ordered.
Village of Kildeer Building Department, 21911 Quentin Road, Kildeer, IL 60047 (847-438-6000). Office hours Monday through Friday, 8 a.m. to 4 p.m. We submit, schedule inspections, and close out the project.
Estate and large-lot kitchens in Kildeer often have more square footage than the layout uses well. Prep, cooking, cleanup, and gathering zones that are too far apart (or too open) reduce daily efficiency.
When the island is too small for family meal prep or the pantry has been reconfigured out of useful reach, a layout rethink produces more value than replacing cabinets in place.
A remodel is the right moment to solve ventilation, refrigeration, range location, and appliance paneling as one coordinated system, planned together before anything is ordered.
Estate and Colonial homes need a kitchen finish language that matches the cabinetry, stone, and millwork the adjacent rooms already carry.
These Delta projects show the finish level, planning standards, and room details behind our kitchen remodel work.
Full kitchen remodel including custom white shaker cabinetry, marble island and countertops, paneled appliances, brass pendants, and a matching espresso-toned bar with glass-front uppers.
View project →
Kitchen remodel with white perimeter cabinetry, walnut fluted island millwork, dark stone counters, brass pendants, paneled appliances, and a custom walnut butler’s pantry with fluted detail and glass-front uppers.
View project →
Northbrook kitchen remodel with light gray shaker perimeter cabinetry, a gray-stained shaker island with calacatta quartz counter and seating overhang, vertical herringbone backsplash, stainless cooktop with stainless chimney hood, drum-shade and slim glass island pendants, X-back white dining chairs, gray-stained wide-plank floor, and a yellow stool accent.
View project →
Evanston kitchen remodel with white shaker cabinetry, light blue subway tile backsplash, marble waterfall peninsula, stainless French-door refrigerator with water dispenser, double oven gas range with stainless microwave above, brushed nickel pulls, recessed lighting, and red oak hardwood flooring.
View project →
Cottage-era kitchen renovation in Lake Bluff with white shaker perimeter cabinetry, a natural oak-base island with calacatta quartz waterfall counter, hexagonal mosaic tile backsplash, glass-front upper cabinetry, stainless French-door refrigeration, glass globe pendant over the island, and a gray porcelain plank floor in herringbone layout. Arched display niche above the fridge preserves a cottage-era detail.
View project →
White shaker kitchen renovation in Lake Forest featuring a calacatta marble waterfall island, brushed brass pulls and pendant cluster, white subway tile backsplash with a herringbone marble range wall, professional gas cooktop with stainless ovens, and oak hardwood floors. Layout reworked around the island for prep, gathering, and clean sightlines into the dining room.
View project →Portfolio images keep the material palette, finish quality, and planning detail visible while we build out more city-specific case studies.
New articles surface here automatically as we publish them.
How to choose a remodeling contractor in Evanston, IL: experience, licensing, reviews, permits, express vs. standard approval times, and visiting Morton City Hall for in-person permit help.
Realistic kitchen remodel timelines for Illinois homeowners: project scope by kitchen type, whether to stay in your home during construction, phase-by-phase schedules, and what causes delays on the North Shore.
Luxury home remodeling in Kenilworth, IL: Cook County permits, historic-home considerations, 2026 cost ranges, safety planning, and what to know before renovating on the North Shore.
Kildeer projects are rarely about finding room for basic function; the space is usually already there. The work is making large kitchens and primary bathrooms feel current, cohesive, and properly scaled for the home.
Estate-scale kitchens in Kildeer (butler's pantries, premium appliances, structural changes) typically run ten to sixteen weeks from demolition through final walkthrough.
Kildeer kitchen remodels are priced after an in-home visit. Cost depends on whether walls move, the cabinetry specification, appliance level, and how much structural work is involved.
Yes. Village of Kildeer Building Department, 21911 Quentin Road, Kildeer, IL 60047 (847-438-6000). Office hours Monday through Friday, 8 a.m. to 4 p.m. Delta - Bathroom and Kitchen Remodeling submits the permit set, coordinates inspections, and closes out the project so homeowners never deal with the building department directly.
Often, yes. In a Kildeer Estate home, the kitchen is usually the main cooking and gathering space, so we map temporary access, utility downtime, and the rough-trades sequence before demolition. You decide whether to stay or plan around the busiest phases.
If the kitchen plan touches plumbing, electrical, tile, or finish direction, review the Kildeer bathroom plan before construction starts.
Tell us about the room. We will follow up within one business day with the next step. No high-pressure sales call.
"I started this firm in 1987. Every project carries the same standard I'd apply to my own home."
A team member will be in touch within one business day. If it is urgent, call (847) 847-4148.