"Where Do I Start? " The Ultimate House Renovation Guide
On this page
- The Step-by-Step Home Renovation Checklist
- 1. Write down why you're renovating
- 2. Set a real budget
- 3. Get the house checked before you design
- 4. Decide: all at once or room by room?
- 5. Pick your team
- 6. Pull permits
- 7. Order materials early
- 8. Plan where you'll live
- What Order Should You Renovate a House In?
- Can You Renovate a House With No Experience?
- How to Renovate a House With No Money (or Very Little)
- Is There a "Remodel My House" App?
- Frequently Asked Questions
- What should I renovate first in an old house?
- Can I live in my house during a renovation?
- How long does a house renovation take?
- How do I get into renovating houses?
- Ready to Stop Wondering Where to Start?
- Sources
"Where Do I Start? " The Ultimate House Renovation Guide: Start with your "why," not your tile. Write down what isn't working, set a budget with a 10–20% cushion, and get the house checked before you design anything. Then hire your team, pull permits, order materials, and only then start demo. That order saves money and stress.
If you've ever thought, "I want to renovate my house, but where do I start?", you're in good company. We hear that exact question almost every week. After more than 500 remodels across Chicago's North Shore, we've learned that the first few decisions shape everything after them.
The Step-by-Step Home Renovation Checklist
Here are the house renovation steps in the order that works. Skip one and you'll usually pay for it later.
1. Write down why you're renovating
Grab a notebook. List what bugs you today: a cramped kitchen, one bathroom for four people, a damp basement. Then list your must-haves and nice-to-haves. It keeps you focused in the showroom.
2. Set a real budget
In 2025, the Houzz & Home Study reported a median renovation spend of $20,000. A full kitchen costs far more. Houzz's 2025 kitchen survey put major kitchen remodels at a $60,000 median.
Add a 10–20% cushion on top. Houzz also found nearly 40% of homeowners who set a budget struggled to stick to it. Our bathroom remodel budget guide breaks down where the money actually goes.
3. Get the house checked before you design
This step gets skipped the most. Have a pro look at the electrical panel, plumbing, foundation and any moisture problems.
Here's what we see often: in pre-1940 homes in Wilmette, Winnetka and Evanston, opening a wall can reveal knob-and-tube wiring or old galvanized pipes. Homes built before 1978 may also have lead paint. Some older materials need asbestos testing before demo. Find these early, and they're a line item. Find them mid-project, and they're a crisis.
4. Decide: all at once or room by room?
Doing everything at once is faster and often cheaper per square foot. Going room by room is easier on cash flow. We compare both in remodeling all at once vs. room by room. Not sure if you need a refresh or a full gut? See our cosmetic refresh vs. full gut comparison.
5. Pick your team
You can hire a separate designer and contractor, or one design-build firm that handles both. Either way, check three things: license, insurance and real past projects. Here's how our insurance works and what to ask any contractor.
6. Pull permits
Every North Shore village has its own rules. Structural, electrical and plumbing work almost always needs a permit and inspections. Skipping them can hurt resale and void insurance claims. Our village-by-village permit guide shows how different towns can be.
7. Order materials early
Cabinets, custom vanities and special-order tile can take weeks or months. Lock your choices before demo day. Mid-build changes blow schedules.
8. Plan where you'll live
Can you cook without a kitchen for two months? Shower somewhere else? Set up a temporary kitchen or plan a stay elsewhere. Our kitchen remodel timeline shows how long each phase usually takes.
What Order Should You Renovate a House In?
Work from the bones out. Messy, structural work comes first. Pretty finishes come last, so nothing gets damaged.
| Order | Phase | Why it goes here |
|---|---|---|
| 1 | Roof, foundation, water issues | Protects everything else |
| 2 | Structural changes | Walls must move before anything gets built |
| 3 | Electrical, plumbing, HVAC rough-in | Hidden inside walls |
| 4 | Inspections, insulation, drywall | Closes up the walls |
| 5 | Flooring, cabinets, tile | Main finishes |
| 6 | Paint, fixtures, hardware | Final touches |
Can You Renovate a House With No Experience?
Yes, but know your limits. Renovating a house with no experience works best for painting, swapping hardware, simple landscaping and demo under guidance.
Leave electrical, gas, structural and most plumbing work to licensed pros. These carry real safety risks, and most villages require inspections anyway. A bad DIY wiring job doesn't just fail. It can start a fire.
How to Renovate a House With No Money (or Very Little)
Honestly? You can't renovate with zero dollars. But you can start small and smart.
- Fix what's failing first. Leaks, roof damage and unsafe wiring come before style.
- Phase it. Do one room a year instead of the whole house.
- Go cosmetic. Paint, lighting and new hardware change a room for less.
- Look at programs. Illinois homeowners may qualify for help, like the IHDA home repair program for accessibility work.
Some homeowners finance with a home equity loan or line of credit. We're not financial advisors, so talk to your lender about what fits your situation.
Is There a "Remodel My House" App?
There are plenty. Houzz and Pinterest are great for collecting ideas. Phone measuring apps help with rough room sizes. But no remodel my house app can see behind your walls or pull permits for you.
Our tip: start a simple spreadsheet as your house renovation checklist template. Use five columns: room, problem, must-have, budget and status. It's free, and your contractor will thank you.
Frequently Asked Questions
What should I renovate first in an old house?
Start with safety and structure: roof, foundation, water problems, wiring and plumbing. In older North Shore homes, we often find outdated systems once walls open. Fixing those first means you won't tear out a new kitchen later to reach a bad pipe.
Can I live in my house during a renovation?
Usually, if you're doing one or two rooms. Whole-house projects, or ones that shut off your only kitchen or bathroom, are much harder. Our clients who stay put do best with a temporary kitchen and a clear dust plan.
How long does a house renovation take?
A bathroom often takes a few weeks. A kitchen often takes a few months. A whole house can take many months. Permits, material lead times and surprises inside walls cause most delays. See our bathroom remodel timeline for a real breakdown.
How do I get into renovating houses?
If you want to make it a career, work under a licensed contractor first and learn each trade. Wondering how to start a house renovation business? You'll need licensing, insurance and permits set up for each town. Start with small jobs and build a portfolio.
Ready to Stop Wondering Where to Start?
If you live in Chicago's North Shore or northern suburbs, we'd love to walk through your home with you. We'll help you sort must-haves from nice-to-haves and give you a clear plan. Request your free estimate or see our past projects first.
Sources
- Houzz, 2025 Houzz & Home Study (median spend), via Clever Dude/AOL, retrieved 2026-10-10
- Houzz, 2025 U.S. Kitchen Trends Survey, via MarketersMedia, retrieved 2026-10-10
- Houzz, 2024 Houzz & Home Study (budget adherence), via GOBankingRates/AOL, retrieved 2026-10-10
Ready to Start Your Project?
Schedule a free consultation. We bring design ideas, material samples, and honest answers.
Book Consultation

